{"id":21160,"date":"2020-01-12T05:50:59","date_gmt":"2020-01-12T10:50:59","guid":{"rendered":"https:\/\/blogs.funiber.org\/pt\/?p=21160"},"modified":"2020-01-09T05:54:14","modified_gmt":"2020-01-09T10:54:14","slug":"funiber-analise-risco","status":"publish","type":"post","link":"https:\/\/www.funiber.blog\/pt\/arquitetura-e-desenho\/2020\/01\/12\/funiber-analise-risco","title":{"rendered":"Metodologias de an\u00e1lise de risco em projetos"},"content":{"rendered":"<h2><strong>Analisar os riscos de um projeto \u00e9 um processo cont\u00ednuo durante sua execu\u00e7\u00e3o<\/strong><\/h2>\n<p>A figura do <a href=\"https:\/\/www.funiber.blog\/pt\/arquitetura-e-desenho\/2018\/04\/18\/funiber-project-manager\" target=\"_blank\" rel=\"noopener noreferrer\">Project Manager<\/a> tem entre suas fun\u00e7\u00f5es avaliar as poss\u00edveis complica\u00e7\u00f5es relacionadas ao alcance, custos, prazos e qualidade dos resultados e aos objetivos do projeto.<!--more--><\/p>\n<p>De acordo com um <a href=\"https:\/\/www.pmi.org\/-\/media\/pmi\/documents\/public\/pdf\/learning\/thought-leadership\/pulse\/pulse-of-the-profession-2016.pdf?v=e14f4e4b-6dba-41f5-a7bd-12bc71921a4c\" target=\"_blank\" rel=\"noopener noreferrer\">estudo<\/a> elaborado pelo Project Management Institute em 2016, apenas 51% dos projetos s\u00e3o conclu\u00eddos no prazo, sendo esse um dos principais riscos ao abordar o trabalho.<\/p>\n<p>Existem v\u00e1rias metodologias que podem ajudar os gerentes de projeto a minimizar o impacto desses riscos, embora elimin\u00e1-los seja uma tarefa pendente, at\u00e9 agora, imposs\u00edvel. Algumas dessas ferramentas s\u00e3o:<\/p>\n<ul>\n<li>M\u00e9todo FMA (modo de falha e an\u00e1lise eficaz): \u00e9 especialmente \u00fatil no setor de engenharia. Por meio de tr\u00eas aspectos (frequ\u00eancia, gravidade e detec\u00e7\u00e3o), poss\u00edveis falhas no projeto s\u00e3o identificadas, classificadas e eliminadas.<\/li>\n<li>An\u00e1lise preliminar de risco (APR): Este sistema foca nas consequ\u00eancias dos riscos que foram detectados. Cada risco \u00e9 analisado e sua consequ\u00eancia, para priorizar posteriormente os problemas detectados em uma escala de maior a menor risco.<\/li>\n<li>Metodologia de an\u00e1lise por meio da matriz de risco: com esta ferramenta \u00e9 estudada a probabilidade desse risco e seu impacto.<\/li>\n<li>Metodologia do caminho cr\u00edtico: com esse mecanismo, uma data \u00e9 atribu\u00edda \u00e0s atividades, dependendo da disponibilidade de recursos.<\/li>\n<li>Metodologia de valor agregado: com esta t\u00e9cnica, ser\u00e1 detectado quanto valor est\u00e1 sendo criado a partir de um projeto, levando em considera\u00e7\u00e3o o ritmo do trabalho e do or\u00e7amento, reais e estimados.<\/li>\n<\/ul>\n<p>A <a href=\"https:\/\/www.funiber.org.br\/\" target=\"_blank\" rel=\"noopener noreferrer\">FUNIBER<\/a> patrocina uma ampla variedade de programas universit\u00e1rios focados em abordar as etapas necess\u00e1rias para a realiza\u00e7\u00e3o de um projeto. Um dos cursos oferecidos \u00e9 o <a href=\"https:\/\/www.funiber.org.br\/mestrado-em-desenho-gestao-e-direcao-de-projetos\" target=\"_blank\" rel=\"noopener noreferrer\">Mestrado em Desenho, Gest\u00e3o e Dire\u00e7\u00e3o de Projetos.<\/a><\/p>\n<p>Fonte: <a href=\"https:\/\/www.sinnaps.com\/blog-gestion-proyectos\/metodologias-de-analisis-de-riesgos\" target=\"_blank\" rel=\"noopener noreferrer\">5 metodolog\u00edas de an\u00e1lisis de riesgos de un proyecto<\/a>.<\/p>\n<p>Foto: Todos os direitos reservados.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Analisar os riscos de um projeto \u00e9 um processo cont\u00ednuo durante sua execu\u00e7\u00e3o A figura do Project Manager tem entre suas fun\u00e7\u00f5es avaliar as poss\u00edveis complica\u00e7\u00f5es relacionadas ao alcance, custos, prazos e qualidade dos resultados e aos objetivos do projeto.<\/p>\n","protected":false},"author":10,"featured_media":21161,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_newsletter_tier_id":0,"footnotes":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false,"jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false}}},"categories":[7],"tags":[5867,1242,855,408,248,911,525,671,641,255,3752,112],"jetpack_publicize_connections":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Metodologias de an\u00e1lise de risco em projetos<\/title>\n<meta name=\"description\" content=\"Analisar os riscos de um projeto \u00e9 um processo cont\u00ednuo durante sua execu\u00e7\u00e3o\" \/>\n<meta name=\"robots\" content=\"noindex, nofollow\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Metodologias de an\u00e1lise de risco em projetos\" \/>\n<meta property=\"og:description\" content=\"Analisar os riscos de um projeto \u00e9 um processo cont\u00ednuo durante sua execu\u00e7\u00e3o\" \/>\n<meta property=\"og:url\" content=\"https:\/\/blogs.funiber.org\/pt\/arquitetura-e-desenho\/2020\/01\/12\/funiber-analise-risco\" \/>\n<meta property=\"og:site_name\" content=\"FuniBlogs - FUNIBER\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/funiber\" \/>\n<meta property=\"article:published_time\" content=\"2020-01-12T10:50:59+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-01-09T10:54:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/blogs.funiber.org\/pt\/wp-content\/uploads\/2020\/01\/funiber-analise-risco.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"587\" \/>\n\t<meta property=\"og:image:height\" content=\"391\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Michelle\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@FUNIBER\" \/>\n<meta name=\"twitter:site\" content=\"@FUNIBER\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Michelle\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/blogs.funiber.org\/pt\/arquitetura-e-desenho\/2020\/01\/12\/funiber-analise-risco#article\",\"isPartOf\":{\"@id\":\"https:\/\/blogs.funiber.org\/pt\/arquitetura-e-desenho\/2020\/01\/12\/funiber-analise-risco\"},\"author\":{\"name\":\"Michelle\",\"@id\":\"https:\/\/blogs.funiber.org\/pt\/#\/schema\/person\/a1eaaa5e57eac866a8c5946946bcf80d\"},\"headline\":\"Metodologias de an\u00e1lise de risco em projetos\",\"datePublished\":\"2020-01-12T10:50:59+00:00\",\"dateModified\":\"2020-01-09T10:54:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/blogs.funiber.org\/pt\/arquitetura-e-desenho\/2020\/01\/12\/funiber-analise-risco\"},\"wordCount\":322,\"publisher\":{\"@id\":\"https:\/\/blogs.funiber.org\/pt\/#organization\"},\"keywords\":[\"an\u00e1lise de risco\",\"Bolsas\",\"Doutorado\",\"Educa\u00e7\u00e3o a Dist\u00e2ncia\",\"Funiber\",\"FUNIBER Opini\u00f5es\",\"GEst\u00e3o de Projetos\",\"mestrado\",\"Opini\u00e3o FUNIBER\",\"Opini\u00f5es Funiber\",\"project manager\",\"Projetos\"],\"articleSection\":[\"Projetos\"],\"inLanguage\":\"pt-BR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/blogs.funiber.org\/pt\/arquitetura-e-desenho\/2020\/01\/12\/funiber-analise-risco\",\"url\":\"https:\/\/blogs.funiber.org\/pt\/arquitetura-e-desenho\/2020\/01\/12\/funiber-analise-risco\",\"name\":\"Metodologias de an\u00e1lise de risco em projetos\",\"isPartOf\":{\"@id\":\"https:\/\/blogs.funiber.org\/pt\/#website\"},\"datePublished\":\"2020-01-12T10:50:59+00:00\",\"dateModified\":\"2020-01-09T10:54:14+00:00\",\"description\":\"Analisar os riscos de um projeto \u00e9 um processo cont\u00ednuo durante sua execu\u00e7\u00e3o\",\"breadcrumb\":{\"@id\":\"https:\/\/blogs.funiber.org\/pt\/arquitetura-e-desenho\/2020\/01\/12\/funiber-analise-risco#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/blogs.funiber.org\/pt\/arquitetura-e-desenho\/2020\/01\/12\/funiber-analise-risco\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/blogs.funiber.org\/pt\/arquitetura-e-desenho\/2020\/01\/12\/funiber-analise-risco#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/blogs.funiber.org\/pt\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Metodologias de an\u00e1lise de risco em projetos\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/blogs.funiber.org\/pt\/#website\",\"url\":\"https:\/\/blogs.funiber.org\/pt\/\",\"name\":\"FuniBlogs - FUNIBER\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/blogs.funiber.org\/pt\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/blogs.funiber.org\/pt\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/blogs.funiber.org\/pt\/#organization\",\"name\":\"FuniBlogs - FUNIBER\",\"url\":\"https:\/\/blogs.funiber.org\/pt\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\/\/blogs.funiber.org\/pt\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.funiber.blog\/pt\/wp-content\/uploads\/2022\/02\/logo-funiber-pt-br-v-dos.svg\",\"contentUrl\":\"https:\/\/www.funiber.blog\/pt\/wp-content\/uploads\/2022\/02\/logo-funiber-pt-br-v-dos.svg\",\"width\":1,\"height\":1,\"caption\":\"FuniBlogs - FUNIBER\"},\"image\":{\"@id\":\"https:\/\/blogs.funiber.org\/pt\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/funiber\",\"https:\/\/twitter.com\/FUNIBER\",\"https:\/\/www.instagram.com\/funiber_becas\",\"https:\/\/www.youtube.com\/user\/funiber\",\"https:\/\/www.linkedin.com\/company\/funiber\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/blogs.funiber.org\/pt\/#\/schema\/person\/a1eaaa5e57eac866a8c5946946bcf80d\",\"name\":\"Michelle\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\/\/blogs.funiber.org\/pt\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/5e87041f7609dc50493cf216754fece1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/5e87041f7609dc50493cf216754fece1?s=96&d=mm&r=g\",\"caption\":\"Michelle\"},\"url\":\"https:\/\/www.funiber.blog\/pt\/author\/michelle-moreira\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Metodologias de an\u00e1lise de risco em projetos","description":"Analisar os riscos de um projeto \u00e9 um processo cont\u00ednuo durante sua execu\u00e7\u00e3o","robots":{"index":"noindex","follow":"nofollow"},"og_locale":"pt_BR","og_type":"article","og_title":"Metodologias de an\u00e1lise de risco em projetos","og_description":"Analisar os riscos de um projeto \u00e9 um processo cont\u00ednuo durante sua execu\u00e7\u00e3o","og_url":"https:\/\/blogs.funiber.org\/pt\/arquitetura-e-desenho\/2020\/01\/12\/funiber-analise-risco","og_site_name":"FuniBlogs - FUNIBER","article_publisher":"https:\/\/www.facebook.com\/funiber","article_published_time":"2020-01-12T10:50:59+00:00","article_modified_time":"2020-01-09T10:54:14+00:00","og_image":[{"width":587,"height":391,"url":"https:\/\/blogs.funiber.org\/pt\/wp-content\/uploads\/2020\/01\/funiber-analise-risco.jpg","type":"image\/jpeg"}],"author":"Michelle","twitter_card":"summary_large_image","twitter_creator":"@FUNIBER","twitter_site":"@FUNIBER","twitter_misc":{"Escrito por":"Michelle","Est. tempo de leitura":"2 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/blogs.funiber.org\/pt\/arquitetura-e-desenho\/2020\/01\/12\/funiber-analise-risco#article","isPartOf":{"@id":"https:\/\/blogs.funiber.org\/pt\/arquitetura-e-desenho\/2020\/01\/12\/funiber-analise-risco"},"author":{"name":"Michelle","@id":"https:\/\/blogs.funiber.org\/pt\/#\/schema\/person\/a1eaaa5e57eac866a8c5946946bcf80d"},"headline":"Metodologias de an\u00e1lise de risco em projetos","datePublished":"2020-01-12T10:50:59+00:00","dateModified":"2020-01-09T10:54:14+00:00","mainEntityOfPage":{"@id":"https:\/\/blogs.funiber.org\/pt\/arquitetura-e-desenho\/2020\/01\/12\/funiber-analise-risco"},"wordCount":322,"publisher":{"@id":"https:\/\/blogs.funiber.org\/pt\/#organization"},"keywords":["an\u00e1lise de risco","Bolsas","Doutorado","Educa\u00e7\u00e3o a Dist\u00e2ncia","Funiber","FUNIBER Opini\u00f5es","GEst\u00e3o de Projetos","mestrado","Opini\u00e3o FUNIBER","Opini\u00f5es Funiber","project manager","Projetos"],"articleSection":["Projetos"],"inLanguage":"pt-BR"},{"@type":"WebPage","@id":"https:\/\/blogs.funiber.org\/pt\/arquitetura-e-desenho\/2020\/01\/12\/funiber-analise-risco","url":"https:\/\/blogs.funiber.org\/pt\/arquitetura-e-desenho\/2020\/01\/12\/funiber-analise-risco","name":"Metodologias de an\u00e1lise de risco em projetos","isPartOf":{"@id":"https:\/\/blogs.funiber.org\/pt\/#website"},"datePublished":"2020-01-12T10:50:59+00:00","dateModified":"2020-01-09T10:54:14+00:00","description":"Analisar os riscos de um projeto \u00e9 um processo cont\u00ednuo durante sua execu\u00e7\u00e3o","breadcrumb":{"@id":"https:\/\/blogs.funiber.org\/pt\/arquitetura-e-desenho\/2020\/01\/12\/funiber-analise-risco#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/blogs.funiber.org\/pt\/arquitetura-e-desenho\/2020\/01\/12\/funiber-analise-risco"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/blogs.funiber.org\/pt\/arquitetura-e-desenho\/2020\/01\/12\/funiber-analise-risco#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/blogs.funiber.org\/pt"},{"@type":"ListItem","position":2,"name":"Metodologias de an\u00e1lise de risco em projetos"}]},{"@type":"WebSite","@id":"https:\/\/blogs.funiber.org\/pt\/#website","url":"https:\/\/blogs.funiber.org\/pt\/","name":"FuniBlogs - FUNIBER","description":"","publisher":{"@id":"https:\/\/blogs.funiber.org\/pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/blogs.funiber.org\/pt\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/blogs.funiber.org\/pt\/#organization","name":"FuniBlogs - FUNIBER","url":"https:\/\/blogs.funiber.org\/pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/blogs.funiber.org\/pt\/#\/schema\/logo\/image\/","url":"https:\/\/www.funiber.blog\/pt\/wp-content\/uploads\/2022\/02\/logo-funiber-pt-br-v-dos.svg","contentUrl":"https:\/\/www.funiber.blog\/pt\/wp-content\/uploads\/2022\/02\/logo-funiber-pt-br-v-dos.svg","width":1,"height":1,"caption":"FuniBlogs - FUNIBER"},"image":{"@id":"https:\/\/blogs.funiber.org\/pt\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/funiber","https:\/\/twitter.com\/FUNIBER","https:\/\/www.instagram.com\/funiber_becas","https:\/\/www.youtube.com\/user\/funiber","https:\/\/www.linkedin.com\/company\/funiber"]},{"@type":"Person","@id":"https:\/\/blogs.funiber.org\/pt\/#\/schema\/person\/a1eaaa5e57eac866a8c5946946bcf80d","name":"Michelle","image":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/blogs.funiber.org\/pt\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/5e87041f7609dc50493cf216754fece1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5e87041f7609dc50493cf216754fece1?s=96&d=mm&r=g","caption":"Michelle"},"url":"https:\/\/www.funiber.blog\/pt\/author\/michelle-moreira"}]}},"jetpack_featured_media_url":"https:\/\/www.funiber.blog\/pt\/wp-content\/uploads\/2020\/01\/funiber-analise-risco.jpg","jetpack_shortlink":"https:\/\/wp.me\/p7ee1t-5vi","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.funiber.blog\/pt\/wp-json\/wp\/v2\/posts\/21160"}],"collection":[{"href":"https:\/\/www.funiber.blog\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.funiber.blog\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.funiber.blog\/pt\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.funiber.blog\/pt\/wp-json\/wp\/v2\/comments?post=21160"}],"version-history":[{"count":1,"href":"https:\/\/www.funiber.blog\/pt\/wp-json\/wp\/v2\/posts\/21160\/revisions"}],"predecessor-version":[{"id":21162,"href":"https:\/\/www.funiber.blog\/pt\/wp-json\/wp\/v2\/posts\/21160\/revisions\/21162"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.funiber.blog\/pt\/wp-json\/wp\/v2\/media\/21161"}],"wp:attachment":[{"href":"https:\/\/www.funiber.blog\/pt\/wp-json\/wp\/v2\/media?parent=21160"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.funiber.blog\/pt\/wp-json\/wp\/v2\/categories?post=21160"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.funiber.blog\/pt\/wp-json\/wp\/v2\/tags?post=21160"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}